
JAW BORING PROCEDURE
|
STEP ONE |
|
|
MARK JAWS (1,2,3) MOUNT JAWS ON CHUCK BOLT ALL MASTER JAWS THE SAME DISTANCE FROM THE CENTER OF THE CHUCK
|
|
| STEP TWO | |
|
MARK INSERTS (1,2,3,) BACK OUT THE CONE POINT LOCK SCREW. PLACE INSERTS IN CORRESPONDING MASTER JAWPLACE INSERT IN MASTER JAW. (MAKE SURE THE HOOK ON THE INSERT IS AGAINST THE LOCK PIN IN THE JAW.
|
|
| STEP THREE | |
|
INSERT PINS IN THE INNER MOST BOLT COUNTER BORE OF THE
MASTER JAWS (MAKE SURE THE PINS FIT THE COUNTER BORE WELL AND GO DOWN AGAINST THE TOP OF THE BOLT HEAD) ONCE INSERTED, THESE PINS SHOULD STICK UP PAST THE MASTER JAW APPROXIMATELY 5/8" TO 3/4" |
|
| STEP FOUR | |
|
CLAMP ON BORING RING WITH THE INSERTED
PINS. THIS RING SHOULD BE APPROXIMATELY 1/2" THICK WITH AN I.D. HOLE WITH ADEQUATE WALL THICKNESS TO ALLOW THE BORE SIZE NEEDED. WHEN CLAMPED THE JAWS SHOULD BE IN THE MIDDLE OF THE TOTAL JAW STROKE |
|
| STEP FIVE | |
| BORE INSERTS APPROXIMATELY .OO5" SMALLER THAN THE O.D. OF THE WORKPART |
|
| STEP SIX | |
|
REMOVE BORING RING AND BORING PINS. INSERT WORK PART AND CLAMP. |
|